flash

AIRPORTS

Uretek work includes supporting, raising and re-levelling runways, taxiways, hangar floors and airport buildings.

A major benefit is the speed of the Uretek repair and consequent savings in money and disruption.

The Uretek slab lifting process is more economical and much less disruptive than slab replacement, which can put areas out of operation for many days.

Sections being repaired by Uretek are out of commission for just hours at a time.

  • Work is carried out one section at a time, at night or other low traffic periods
  • Injected Uretek materials reach 90% strength in 15 minutes, so airport operations can resume immediately
  • The Uretek solution is long-lasting

The Uretek method is economical, fast, and involves minimal disruption to operations.

Download our Underground Control for Airports brochure (PDF).

phoneemail

airports
case studies URETEK process