Projects | URETEK UK Skip to main content

 

6 000 m² base slabs raised

Settlement to base slabs at a rail depot in Farnham, near London, threatened to disrupt rail operations in south-east England.

Read moreRead more

Embankment Ground Strengthening, Brunel-Designed Bridge

GPR surveys identified voiding under the entire surface of the walkway of Hiscocks Bridge in Bath resulting in settlement to embankments on the approaches. 

Read moreRead more

Provost Driver Court Remedial Works

Uretek was contacted to investigate settlement issues affecting the pumping stations at the end of Provost Driver Court in Renfrew

Read moreRead more

Factory floor lift

URETEK stabilized and lifted factory flooring in a West Country industrial facility with racking up to 90ft high.

Read moreRead more

Major distribution warehouse relevelled

URETEK were brought in to relevel the floor of a major industrial building whilst allowing it to remain fully operational.

Read moreRead more

Sunken Bank Vault Stabilised, South Africa

Sunken bank vault in South Africa was stabilised using URETEK geopolymer injections.

Read moreRead more

Subsidence affecting flats

Uretek treated subsidence on a block of flats in Birmingham by injecting materials under the ground. The building was suffering extreme cracking due to the ground beneath being continually water logged.

Read moreRead more

Subsiding homes stabilised

The client chose to use the URETEK systems due to the minimal disruption that would be caused by our works, to the elderly residents

Read moreRead more

War Memorial levelled

URETEK treated the ground underneath the War memorial in Abingdon quickly and cleanly, with no mess and no need to move the memorial.

Read moreRead more

Motorway stabilisation sewer works

A collapsed Victorian sewer running below the A74 London Road, Glasgow caused significant localised softening of the soils due to water ingress.

Read moreRead more

Hangar re-supported at air force base

At the Royal Australian Air Force Base at Williamtown, New South Wales, a number of the hangars for FA 18 jet fighters had developed major ground problems.

Read moreRead more

Midland Mainline slabs lifted

We delivered some urgent works to the ground beneath the Midland Main Line approach to St Pancras Station at Kentish town.

Read moreRead more

Bath City Centre Road Stabilisation

Bath and North-East Somerset council needed to find a way to stabilise the rigid construction road slabs

Read moreRead more

Abbeydale water sealing

Uretek used its water sealing methods to seal a dam from an adjoining mill.

Read moreRead more

Road Stabilisation - Reading

Uretek used its resin injection technique to stabilise the ground under Northumberland Avenue in Reading. The longevity of a new asphalt surface was dependent on the ability to stabilise the movement on the ground beneath.

Read moreRead more