Before and After
Before and After
Settled flooring can be restored to level within one working day, avoiding the need for occupants to be rehoused.
Before and After
Cracks in this building occurred due to disturbed ground caused by adjacent building works. Polymer injection caused the cracks to close up successfully.
Before and After
External brickwork restored
Before and After
Industrial slab re-levelled within hours
Before and After
Kitchen work surfaces returned to original level.
Before and After
Vertical cracking closes as differential settlement is cured.
Before and After
Internal wall settlement corrected while bookcases and furniture remain in place
Before and After
Settlement in hardstanding slabs creates trip hazards and dangers for forklifts, which can be quickly resolved using polymer injection.








